What is bill of materials?

Also: BOM

A list of the parts and the amount of each needed to make one product.

What it means on the job

A door shop's BOM for a prehung unit lists the slab, jamb parts, hinges, stops and the rest. In manufacturing it lives in the ERP.

Watch out

A bill of materials is for making a product. A material takeoff is for a project. People mix the two up.

Sources

Also built on Grit Guide’s shared glossary. Makers and codes word things differently, and rules change by edition and by state. When a size, rating or rule decides an order, use the manufacturer’s current documents and the code your jurisdiction has adopted.