WatchBehind the Build

How High-Performance Window Spacers Are Made & Why They Matter: GED Intercept Extreme at GlassBuild

GED, Vitro, and Technoform show Intercept Extreme at GlassBuild 2025: how a window spacer goes from flat coil to finished part, what the new thermal break changes, and what it takes to put the system in a vinyl window shop.

With Joe Shaheen, GED and Bill Davis, Technical Service and Product Manager, Intercept insulating glass technology, Vitro Architectural Glass

14 min

What you’ll Learn

  1. An Intercept spacer starts as flat metal coil. The machine punches it, roll forms it into a U-shaped channel, cuts it to the size of the window, and adds punches where grids click in.

  2. Intercept Extreme keeps the U shape but puts a polymer base between stainless steel sidewalls. The polymer breaks the path heat would take through the metal, and that is where the better thermal performance comes from.

  3. A better spacer can change the rest of the window. Joe Shaheen says it may help some fabricators hit their thermal numbers without going to triples or adding a fourth surface low-e.

  4. The system is sized to the shop. Seven operators can build over 2,500 insulating glass units in an 8-hour shift, and GED is working toward 3 to 4 operators producing 1,000.

  5. Buying a machine like this is a process. Joe puts lead time at 4 to 6 months, setup at two to three man-weeks, and floor space at about 30 feet wide by 75 feet long.

Chapters

  1. 0:09A New Spacer Machine at GlassBuildThe Intercept Extreme at the GED booth and the labor problem it is aimed at.
  2. 1:07What GED Is LaunchingJoe Shaheen on Intercept since 1991 and the three companies behind the new product.
  3. 2:40Vitro on the Spacer DesignBill Davis explains the stainless steel sidewalls and polymer bridge base.
  4. 3:56Technoform on Energy Star 7Helen Sanders on plastic extrusion and meeting the new requirements without losing line speed.
  5. 4:26From Flat Coil to SpacerEach station in order: coil, punch press, roll former, cutoff, then sealant and matrix.
  6. 7:20The Machine RunningThe line runs live and Joe shows a finished spacer with the thermal break.
  7. 8:59Who the System Is ForVinyl residential window fabricators who care about thermal performance and U values.
  8. 10:03Volume and OperatorsHow many units a shift, how many people, and scaling down for smaller shops.
  9. 11:53Lead Time, Setup, and Floor SpaceWhat ordering looks like: months of lead time, weeks of setup and the footprint.

About This Video

GED introduced Intercept Extreme at GlassBuild 2025 in Orlando, the newest version of the Intercept spacer system the company first brought out in 1991. Joe Shaheen of GED tells Stefanie Couch it was built with two partners. Bill Davis of Vitro Architectural Glass explains the design: the familiar U-shaped spacer, now with stainless steel sidewalls and a polymer bridge base that decouples heat transfer. Helen Sanders of Technoform North America says her company brought precision plastic extrusion, and that the aim is to meet Energy Star 7 requirements without giving up line speed or durability.

Joe then walks the machine. Flat coil feeds into a punch press, a roll former shapes it into the U channel, and a cutoff station cuts each spacer to the window size sent from the office software, with punches where grids click in. He says one operator can make up to 2,800 spacers in an 8-hour shift.

The rest is practical. The system is aimed at vinyl residential window fabricators in North America. Seven operators can build over 2,500 insulating glass units in a shift, and shops that need less can run fewer people. Lead time is 4 to 6 months.

Why a spacer matters in a window

A double pane window has two sheets of glass with a gap between them. The spacer is the strip that runs around the edge and holds that gap open. It also carries the seal that keeps moisture out. Because it touches both panes, heat can sneak through it. That makes the spacer a weak spot for energy loss and for condensation, the water that beads up on cold glass.

At GlassBuild 2025 in Orlando, GED ran its spacer line live on the show floor. The booth was showing Intercept Extreme, a new spacer with better thermal performance. Thermal performance is how well a window slows heat moving in or out. The video opens on a problem many window shops share: there are not enough people to hire. A line that turns out more windows with a small crew speaks to that.

Three companies, one spacer

Joe Shaheen of GED explains that the company first brought out Intercept in 1991. It has kept changing the machines and the metal since. The line at the booth is the Intercept 2.5, the fourth generation, first released in 2014. For the past ten years it has run tin plated steel and stainless steel.

Bill Davis of Vitro Architectural Glass says Vitro and GED have worked together for over 30 years. He lists past steps forward, like thin plate spacer metals and the i3 machine platform. The new spacer adds a third partner, Technoform. Helen Sanders, general manager of Technoform North America, says her company brings precision plastic extrusion. Extrusion means pushing material through a shaped opening to make a long, even profile. Technoform can also run steel and plastic together in one profile.

Watching the line run

Joe walks the line from start to finish. The machine holds several coils of metal, and the crew can switch between them fast.

When the line starts, the pounding is the punch press. It punches the corners and marks the size of each spacer. Loop control keeps the metal feeding at an even pace between stations. Next, the roll former bends the flat strip into a U shape. Then the cutoff station cuts each piece loose. This is the first point where a single spacer exists, sized for one window.

The sizes come straight from the shop’s office software, so no one keys them in at the machine. The last station adds sealant and a desiccant matrix. Desiccant is a drying material that soaks up moisture inside the sealed glass. That station was not at the booth, so the spacers came out bare.

Which window shops it fits

Joe says GED builds for vinyl residential window makers across North America. Some of those shops passed on Intercept in the past because it could not reach their thermal targets. He says the new spacer may let some of them skip triple pane glass or an extra low-e coating. Low-e is a thin coating on the glass that reflects heat.

The crew size is flexible. Joe says GED can train a shop to run fewer operators for a smaller daily count, starting around 500 or 600 units. The company starts by asking what the shop is trying to do.

Buying, setup, and floor space

Joe gives the plain facts on buying one. During the pandemic, lead times ran past a year. Now they are back near normal. A couple of operators can help with setup and finish in about a week and a half to two weeks.

The machine itself is about 65 feet long. The assembly side holds a washer, an oven, and assembly conveyors, and runs another 60 to 70 feet. A shop that wants to free its people for work that cannot be automated should start by measuring the floor.

What To Do With This

  1. Learn the stations in order

    Watch the machine run and name each step: coil, punch press, roll former, cutoff, then sealant and desiccant matrix. Knowing the order helps you follow any conversation about how insulating glass is built.

  2. Start from your real shift volume

    Write down how many insulating glass units your shop needs per shift before you talk equipment. GED says it sizes the crew and the system to that number, from 500 or 600 units up to more than 2,500.

  3. Measure the floor first

    Mark out about 30 feet by 75 feet. That is the space Joe Shaheen says the full system needs, counting the washer, oven, and assembly conveyors on the assembly side.

  4. Plan the purchase months ahead

    Count back from the date you need the capacity. Lead time is 4 to 6 months, and setup takes two to three man-weeks after the machine arrives.

Plain English

Intercept spacer
A U-shaped metal channel made from flat coil, cut to the size of the window, then folded up to make the insulating glass unit.
IG unit
Short for insulating glass unit, the glass assembly a window fabricator builds around the spacer.
roll former
The station that takes flat coil and shapes it into the U-shaped channel.
grid punches
Punches made in the spacer so a grid snaps in with a click you can see and hear, straight and consistent.
thermal break
In this spacer, the polymer base between the stainless steel sidewalls that decouples heat transfer.

Questions this video answers

What is a window spacer?

It is the strip around the edge of an insulating glass unit that holds the two panes apart and carries the seal. Intercept spacers start as flat metal coil and are bent into a U-shaped channel. The channel is then folded around the glass to make the unit.

What is different about Intercept Extreme?

Bill Davis of Vitro says it keeps the U shape of other Intercept spacers. It adds stainless steel sidewalls and a polymer base that cuts the path heat takes through the metal. GED calls it the highest thermal performing spacer system in North America.

How many people does it take to run an Intercept line?

Joe Shaheen says seven operators can build over 2500 insulating glass units in an 8 hour shift. Shops that need fewer units can run fewer people. GED is working toward 3 to 4 operators making 1,000 units.

Can a better spacer help a window meet Energy Star 7?

Helen Sanders of Technoform says the new spacer is meant to help window makers meet Energy Star 7 without giving up line speed or durability. Joe Shaheen adds that it may let some shops avoid triple pane glass or an extra low-e coating.

How much floor space does the system need?

Joe Shaheen says to plan on about 30 feet wide by 75 feet long. That covers the spacer machine plus the assembly side with the washer, oven, and conveyors.

The guests

Hosted by Stefanie Couch.

In their own words

“So whether you're looking to maximize condensation resistance, improve insulating value, or meet the latest Energy Star criteria, Intercept Extreme is the clear choice.”

Bill DavisHear this at 3:16

“we can get thousands of spacers off of each coil of material.”

Joe ShaheenHear this at 5:12

“And then we fold this up and make the actual window or IG unit. And it gets folded with all the materials in place and now it's ready to go.”

Joe ShaheenHear this at 8:17

“But it's going to be a process. You said the right word. It's a process.”

Joe ShaheenHear this at 12:23

“We start always with flat coil. No matter what the material, we start with flat coil.”

Joe ShaheenHear this at 4:52

“Cuz some people don't need 2,000, 3,000 units in a shift. They need 800, 900, 1,000. And we can achieve that with this system with fewer operators.”

Joe ShaheenHear this at 10:39

“It's the combination of automation and operation, right? We want to understand what your operation is trying to accomplish and help you get there.”

Joe ShaheenHear this at 11:18

“We're back to a more normal situation where you're looking at 4 to 6 months lead time. And the setup for a full system is probably going to be two to three man weeks.”

Joe ShaheenHear this at 12:03

Full transcript

13:47 · 9 chapters

Click any timestamp to jump to that moment in the video.

A New Spacer Machine at GlassBuild

0:09 Transcript: I'm Stephanie Couch and I'm here today on site in Orlando, Florida at Glass Build 2025 here at the GED booth and I'm checking out something new and extreme. This machine is one of the most amazing things I've seen here at Glassfield. Let's check it out. It is the Intercept Extreme. So, if you're looking for a machine to help volume and capacity in your shop manufacturing vinyl windows, you found it. I'm going to show you the behind the scenes.

0:38 Transcript: In our industry, one of the biggest problems that I hear people talk about is labor constraints. And I don't think that's going to get any easier in the next few years. A machine like this can help you increase your volume with only 3 to seven people working on this. up to 2500 windows per day manufactured on this machine. That's pretty incredible.

What GED Is Launching

1:07 Transcript: I'm here on the glass build floor and I have found my friend Joe Shaheen. We're looking at the GED booth and there's a lot going on here. Tell me what's new and exciting at GED in 2025. Well, actually, we're really excited to be here at Glass Build, not only for the event itself, which we've participated in in years, but also for the introduction of our new product, Intercept Extreme. Intercept has evolved over the years.

1:31 Transcript: We we came out with Intercept in 1991, and since that time, we've continually evolved the process, the machines, and the product. Today, we're introducing the latest in the product. It's called Intercept Extreme. It is the highest thermal performing system in North America. This was an actual collaboration between three companies efforts, three leading companies in the industry. Vitro has been our partner since the inception of Intercept in in the early 90s. But for this product, we brought in Technoform with their expertise.

2:02 Transcript: We have people from both Vitro and Technoform to talk to us today about the product and the technology and some of the effort. But there's been a lot of things happening with this machine, upgrading it and everything else. We're actually going to run the machine. We're going to show you the machine and how it runs and how it processes the product. So, while we've had a lot of things happening with the Extreme product, the two companies that participated with us that were partners with us were Vitro and Technoform.

2:26 Transcript: I want to have Bill Davis from Vitro talk a little bit about their efforts and Helen Sanders from Technoform talk about their contribution to this as well.

Vitro on the Spacer Design

2:40 Transcript: I'm Bill Davis. I'm with Vro Architectural Glass. I'm the technical service and product manager for Intercept insulating glass technology. Vitro and GED Integrated Solutions have partnered for over 30 years to deliver the window and door industries leading insulating glass fabrication technology, Intercept. This technology has continually evolved over time to meet rising customer expectations, building codes, and Energy Star standards. Key innovations include ultra stainless steel and thin plate spacer metals, the i3 machine platform, and advanced features like corner plus shore lock and light lock technologies.

3:16 Transcript: So now we're excited to announce a new collaboration with Technoform to introduce a new spacer technology, Intercept Extreme. Intercept Extreme retains the proven U-shaped design of the Intercept family and now includes enhanced with stainless steel sidewalls and a polymer bridge base that effectively decouples heat transfer. This innovative combination delivers best-in-class thermal performance, making it the highest performing spacer available in North America. So whether you're looking to maximize condensation resistance, improve insulating value, or meet the latest Energy Star criteria, Intercept Extreme is the clear choice.

3:52 Transcript: This latest advancement showcases the power of partnership.

Technoform on Energy Star 7

3:56 Transcript: Hello. Um I'm Helen Sanders. Um I'm from Technoform. I'm the general manager of Technoform North America. Vitro and GED partnered with um Technoform um for this new product because of the expertise in precision plastic extrusion and co-extrusion with steel and plastic. What the new product does is it provides um fenistration manufacturers with a way to meet uh the new energy star 7 requirements without compromising their line speed or um durability.

From Flat Coil to Spacer

4:26 Transcript: As I mentioned a little bit earlier, we have continued to evolve the process. Intercept was introduced in the early 90s and we've introduced different products, different materials, different evolutions to the machine. This current machine is our Intercept 2.5 which is our fourth generation that was come out in 2014. We have different materials that we've run on it for the last 10 years. Both a tin plated steel and a stainless steel getting different thermal performance.

4:52 Transcript: Today's introduction of Extreme gives us a thermal break to stainless steel product and this gives the best thermal performance in North America. I want to show you a little bit about the machine and how we do it. We start always with flat coil. No matter what the material, we start with flat coil. This machine has multiple coils that you can change over from one to the other, back and forth very quickly, very easily.

5:12 Transcript: And we'll actually demonstrate that for you. But as you can see, the machine starts with coil coming out as flat coil off of a of a roll. we can get thousands of spacers off of each coil of material. Then as we start the process, we control the feed of the material through what we call loop control feeding into our feeder and punch press where we punch the material to the actual size and the corners of each of the spaces that we're going to do.

5:41 Transcript: Once we get through that, we go through another loop control and into our roll former. This takes the flat coil and makes it into this U-shaped channel that is famously intercept over the past again 30 plus years. As it comes out of here, it comes into our cut off and suage area. The cutff is where we actually cut the piece from the coil for the first time. So, it's at this point that we now have an individual spacer that is designed for whatever size window that you're going to be building, fabricating.

6:11 Transcript: All the software comes through from the front end office system into our computer. We translate it into the machine. So we cut not only the spacers to size and length, but also we actually put in grid punches so that when you got to put in a grid, when you have to put in a grid into this the spacer, it's a visible and audible click. So you get very straight, consistent, robust, steady uh grid insertion into that spacer.

6:38 Transcript: As it comes off here, the final step is where the spacer gets applied sealant and desiccated matrix to it. We don't have that part of the machine here today cuz we're just

6:49 Transcript: illustrating the spacer for now. But once you have this done, you have a full system that allows one operator to create effectively up to 2,800 spacers in a single 8 hour shift. There is no system that has the volume, the capability, and the stable robustness of the spacer system that Intercept has. And it's been that way for over 30 years. Now, again, we're introducing a brand new product called Extreme, and it's going to be revolutionary to the industry because now we've got the greatest thermal performance out there.

The Machine Running

7:20 Transcript: So, now we're going to run the machine and I'll show you the finished product at the end. So, let's walk through the process. Starting now. That pounding is doing the punches that we talked about. Feed the material through. You can kind of see it moving.

7:40 Transcript: Coming out of the feeder. We see all the punches in the material here and feeding directly up into the roll former.

7:54 Transcript: You can kind of see the finished product coming out of the roll former in that U shape. And then we're going to go right into the cut off section. This is where it's separating out. And you can see individual pieces coming out. See it cutting off here as we go.

8:17 Transcript: And then while we while we don't have sealant and matrix on the product, this is the finished unit. This is a spacer with the thermal brake in it. It's got the punches for the corners. It's got uh grid locations if and as needed. And then we fold this up and make the actual window or IG unit. And it gets folded with all the materials in place and now it's ready to go.

Who the System Is For

8:59 Transcript: Who would you say could benefit the most from using a machine like this in their shop?

9:03 Transcript: Our focus has always been vinyl window fabrication operations throughout North America. Vinyl residential windows. So, anybody that's concerned about thermal performance, U values in their window system can use this system. Intercept is the most widely spread system in the industry today, but there have been applications where customers couldn't use Intercept because the thermal performance didn't quite hit those numbers.

9:27 Transcript: But now with Extreme, there is no number we can't hit. We are again the best thermal performance spacer in the industry. So we can help people maybe avoid triples, maybe avoid that special uh fourth surface lowe because our spacer does give you the best performance now. So it's really anybody that's building vinyl windows in North America.

9:48 Transcript: Would you say that it's extreme results, Joe?

9:52 Transcript: Extreme. I wonder where that name came from and how we got that kind of pun, but yes, it is extreme performance. It is absolutely the most extreme thermal performance in the industry. That's that is part of it.

Volume and Operators

10:03 Transcript: What do you see some of the problems that people have in the industry that you know maybe they don't know how much gain they could get from a machine like this? What are the biggest problems you're solving?

10:14 Transcript: Well, for us it's about volume, right? As I said earlier, with this system you can achieve, you can build, you can manufacture over 2500 IG in a single 8 hour shift. The challenge we have is because it's such a high volume system, we have a lot of people involved. you need seven operators to get that. We're actually working now with this system to try and get you 3 to four operators to produce a,000 units.

10:38 Transcript: Wow.

10:39 Transcript: That would exceed a lot of the the other uh manufacturing options that are out there. And and we can show customers with the proper training how to use fewer operators and get a lesser volume, right? Cuz some people don't need 2,000, 3,000 units in a shift. They need 800, 900, 1,000. And we can achieve that with this system with fewer operators.

11:01 Transcript: Yeah. So you're really building this to suit whatever need volume that that shop has. And so anyone can actually use this. You don't have to be building 2500 units. But if you get this machine, you probably could up your capacity as you go sell some more.

11:18 Transcript: Well, I'm going to I'm going to use the GED tagline, intelligent automation. It's the combination of automation and operation, right? We want to understand what your operation is trying to accomplish and help you get there. This is the only system that can get you 13,4800 2,000 units in a shift. So scalability is here only with Intercept, but we can start you with 5 or 600 units if that's what you want. So yes, we look at what is it you're trying to accomplish, what are your goals for your operation, and we'll help you get there.

11:49 Transcript: So, incorporating automation intelligent.

Lead Time, Setup, and Floor Space

11:53 Transcript: If I wanted to order one of these bad boys today,

11:56 Transcript: I got a guy.

11:57 Transcript: Tell me about the process of how do I get this ordered? How long does it take? What's the setup like? Talk me through that, Joe.

12:03 Transcript: Wow. Okay. So, lead times are going to be variable, right? We've had a lot of things happen in our industry over the years. Uh uh with COVID and the pandemic, things went crazy and lead times were out over a year. We're back to a more normal situation where you're looking at 4 to 6 months lead time. And the setup for a full system is probably going to be two to three man weeks.

12:22 Transcript: Okay.

12:23 Transcript: Uh we can get a couple operators in there and get it done in a week and a half, two weeks maybe. But it's going to be a process. You said the right word. It's a process. It's not snapping wishing all of a sudden I have.

12:34 Transcript: Yeah. And how much space do you need to actually set this machine up and run this machine?

12:39 Transcript: Well, this machine fully set up is about 65 ft long. And then there's a mirrored side, what we call the assembly side where you have a washer and oven and assembly conveyors. And that's another 60 to 70 ft. So you really need about 30 ft in width and about 75 ft in length to really utilize the system correctly.

12:59 Transcript: We'll do the math on that, Joe, and figure out the square footage. Well, this is an incredible tool that people can use. And I think that as labor continues to be a constraint, our business is always going to be labor constrained. Yes. That this can help you take the labor you can get and use it maybe somewhere else in your shop that you can't automate. So that intelligent automation, you've got it happening here.

13:21 Transcript: It is super extreme, Joe. And I like it. I'm here for it. Thank you for showing us this amazing equipment. And if you are interested in automating your shop intelligently, Joe's the man.

13:46 Transcript: You feel me?